Renovation Tips

Bathroom Renovation: Before & After — A Kilimani Home Transformation

One of our most satisfying recent projects was a full bathroom renovation for a client in Kilimani, Nairobi. Here’s the full story.

The Challenge

The client had a 1990s-era bathroom with cracked tiles, a leaking shower, outdated fixtures, and poor lighting. They wanted a modern, spa-like retreat without an excessive budget.

What We Did

  • Full demolition and disposal
  • Waterproofing membrane application
  • Large-format porcelain tile installation (floor and walls)
  • Rain shower with body jets
  • Floating vanity with backlit mirror
  • Heated towel rail
  • LED ambient lighting system

The Result

A stunning, spa-inspired bathroom that the client describes as better than a 5-star hotel. Total project cost: KES 280,000. Completed in just 10 working days.

A

Administrator

Renovation Expert · Suimas Interiors

Our team of renovation and interior design specialists has been transforming spaces across Nairobi for over 10 years.

More Renovation Tips

Process of Replacing Old Floors
Renovation

The Process of Replacing Old Floors

Replacing old flooring can transform a home or commercial space, improving its appearance, comfort and ease of maintenance.…