Renovation Tips

Bathroom Renovation: Before & After — A Kilimani Home Transformation

One of our most satisfying recent projects was a full bathroom renovation for a client in Kilimani, Nairobi. Here’s the full story.

The Challenge

The client had a 1990s-era bathroom with cracked tiles, a leaking shower, outdated fixtures, and poor lighting. They wanted a modern, spa-like retreat without an excessive budget.

What We Did

  • Full demolition and disposal
  • Waterproofing membrane application
  • Large-format porcelain tile installation (floor and walls)
  • Rain shower with body jets
  • Floating vanity with backlit mirror
  • Heated towel rail
  • LED ambient lighting system

The Result

A stunning, spa-inspired bathroom that the client describes as better than a 5-star hotel. Total project cost: KES 280,000. Completed in just 10 working days.

A

Administrator

Renovation Expert · Suimas Interiors

Our team of renovation and interior design specialists has been transforming spaces across Nairobi for over 10 years.

More Renovation Tips